Turnkey Changing Places Toilet Service
There is a lot to consider when planning the installation of a new Changing Places Toilet. From the location and size of the room needed, the specific construction work required to make the room ready for equipment installation, to the choice of equipment, building regulations and other Changing Places Toilet specification requirements.
Because of the complex nature of the work, and the specialist knowledge required, we are increasingly working with clients on a turnkey basis, providing end-to-end support and managing the planning and installation from initial site-survey, through to final room sign off.
The equipment knowledge gained as a long-term UK manufacturer of Changing Places equipment, alongside our team’s extensive experience of project managing Changing Places Toilet installations over more than 10 years, puts us in an ideal position to support clients throughout the process.
Changing Places Toilet Turnkey Project Process
1. INITIAL SITE VISIT & PROJECT SCOPING
Projects work best when we are involved at an early stage. We can offer advice on toilet location, room size and can identify opportunities for room remodelling within existing buildings, or advise on possible locations for modular buildings.
2. DESIGN & EQUIPMENT CHOICES
Changing Places Toilets have to adhere to strict specification requirements. We can advise on appropriate equipment choices and will design the room layout to meet those, as well as to maximise the space. Detailed CAD drawings are available at an early stage.
3. BUILDING WORKS
We have teams across the UK who are experienced in Changing Places Toilet installation and undertaking the associated building works, including necessary demolition and reconfiguration of the space, preparing the walls, adapting mains services including drainage and installing wall, floor and ceiling finishes.
4. ADVISING ON OTHER CONSIDERATIONS
As well as project managing the Changing Places Toilet build itself, we can advise on related considerations, such as external signage and building/room access.
5. SIGN OFF AND POST-INSTALLATION
Once completed, the Changing Places Toilet is thoroughly inspected and equipment commissioned prior to opening. We can also advise on post-installation maintenance, offer staff training and demos, and support you to officially launch and advertise your new Changing Places Toilet.
Want more information about out turnkey Changing Places Toilet service?
ABOUT ASTOR BANNERMAN
Astor Bannerman are a UK manufacturer offering the full range of products specified by Changing Places regulations, including fixed and mobile changing tables, hoists, height adjustable washbasins, toilets and accessories. They have over 27 years’ experience of designing and installing equipment for disabled people and their families.